UNDERGROUND
TANK REMOVAL

Experience makes the difference—from
straightforward removals to the most complex sites.

Safe tank removal – without unnecessary disruption to your property or project

Since 1946, RW Collins has completed more underground tank removal projects than any other company in Chicago. We have the experience, equipment, and insight to complete tank removals of any size efficiently and within budget—even when site conditions present unique challenges.

Our experience ranges from individual underground tanks to complete tank farm decommissioning for oil companies, chemical manufacturers, and other industrial operations. We remove tanks ranging from 130 to 100,000 gallons at commercial and residential properties, gas stations, airports, schools, hospitals, trucking terminals, industrial facilities, and active construction sites.

We just called RW Collins to do another job for us. RW Collins has removed two underground tank farms for us and removed tanks from inside our plant. We didn’t even consider any other firm when we had another tank removal requirement.

James Burgener | B-B Chemical Corporation

GROUNDED IN EXPERIENCE

WHAT WE HANDLE

Underground tanks from 130 to 100,000 gallons

Tank farms + complex multi-tank systems

Oil company + chemical manufacturing facilities

Commercial, industrial, + residential properties

Tanks encountered on active construction sites

WHAT WE DO

Underground storage tank removal

Complete tank farm decommissioning

Tank removal around foundations + structures

Removal around utilities + underground obstructions

Tank removal in high-water conditions

HOW WE DELIVER

Highly experienced tank removal crews

Illinois, Indiana, + Wisconsin tank removal licenses

OSHA 40-hour HAZMAT-trained personnel

Confined Space Entry training

UST Decommissioning Certification

READY TO DISCUSS
YOUR PROJECT?

Tell us a little about what you need. We’ll help you determine the next steps.

OR CALL US AT 708-458-6868

FEATURED PROJECTS

Every project is different—these highlight our expertise in Underground Tank Removal services. We’re ready to discuss your unique needs. See more Featured Projects.

O’Hare Super Satellite Tank Farm

RW Collins Co. was contracted to perform decommissioning and removal of (18) 50,000-gallon Jet A fuel underground storage tanks at O’Hare International Airport. These massive tanks were located in between taxiways near the International Terminal at O’Hare and provided a number of logistical challenges. In addition to the underground tank removal scope, RWC performed excavation of almost 50,000 tons of contaminated soil and final grading and restoration for the previous tank farm and support areas. This tank farm was the largest tank removal by volume in Illinois history.

UST Removal – West Chicago, IL

RW Collins removed three 30,000 gallon underground storage tanks at a manufacturing facility in West Chicago, IL. These tanks were previously installed by RW Collins in 1992, and were removed as a result of a plant closing.