MGP Site Remediation — Ohio
MGP Site Remediation — Ohio
Site remediation at a former MGP site in southern Ohio. Site was in close proximity to the Ohio River and an underground cavern used for natural gas storage.
Remediation Tasks:
- Excavation of various areas of the site including coal tar impacted soils
- Disposal of all excavated materials
- Backfill excavated areas
Other Tasks:
- Implemented erosion and storm water control measures
- Supported installation of a soldier beam and lagging earth retention system
- Excavation de-watering
- Application of odor control measures
- Restoration of the work area
Project Facts
- 230-day project
- Excavation to a depth of 40 feet
- 130,000 tons of excavation and disposal; replaced with gravel backfill








